
When the grid can’t provide enough power
While re-developing an old warehouse site into their modern multi-purpose office and conference venue, Planetshakers discovered that the grid could…
Case StudyCapstone’s microturbine systems are installed and operating at thousands of sites globally, from oil rigs to office complexes.
So far, Optimal have shipped a total of 401 units and 34 megawatts to Australia – this is across 324 sites.
If you would like more information about these projects or would like to arrange a site visit
please call +61 (0) 3 9545 1077 or complete our Cost Savings Form.
While re-developing an old warehouse site into their modern multi-purpose office and conference venue, Planetshakers discovered that the grid could…
Case StudyPerfection Fresh (formerly D’Vine Ripe) is an Australian fruit and vegetable wholesaler and producer of glasshouse-grown tomatoes. Optimal was engaged…
Case Study